Lincoln 1100 ユーザーズマニュアル

ページ / 24
Impinger II – Installation & Operation Manual 
13
YOU ARE NOW READY FOR THE SERVICES TO BE CONNECTED.  THIS SHOULD BE DONE BY A 
QUALIFIED PLUMBER, ELECTRICIAN, OR INSTALLER OF YOUR CHOICE.  
FOR INSTALLATION IN THE 
STATE OF MASSACHUSETTS: INSTALLATION OF THIS OVEN MUST BE PERFORMED BY A LICENSED 
PLUMBER OR GAS FITTER.
  REFER TO “UTILITY SPECIFICATIONS” AND “INSTALLATION CODES AND 
GUIDELINES” SECTIONS FOR ADDITIONAL INFORMATION.
 
 
NOTICE:  The manual shut-off valve must be installed so that the test plug is on the oven side of the valve. 
 
DO NOT ATTEMPT TO OPERATE THE OVEN 
until connection of utility service and installation has been 
fully inspected (START-UP CHECKOUT) by and Authorized Service Technician or a Lincoln Foodservice Products, 
LLC Service Representative.  This service is required by Lincoln Foodservice Products, LLC in order to assure the 
oven(s) is/are properly installed and in working order.  The warranty becomes effective upon verification of proper 
installation. 
 
The warranty shall not apply if the oven(s) is/are started up and operated prior to the “START-UP CHECKOUT” 
being performed by an Authorized Service Technician or a Lincoln Foodservice Products, LLC Service 
Representative. 
 
 
 
 
 
 
 
 
 
 
PROGRAMMING
  
 
 
Do not work around conveyor belt with long hair, loose clothing, or dangling jewelry.  Getting caught in the 
belt could result in serious injury. 
 
 
DANGER! 
!
 
If the power supply cord appears to be damaged, do not attempt to operate the unit.  Contact a service 
agent or qualified electrician to repair! 
 
 
DANGER! 
!
CONTROL PANEL ILLUSTRATION 
Display 
On / Off Switch 
Temperature 
Time UP 
DOWN