Bunn FPG-2 ユーザーズマニュアル

ページ / 79
45
SERVICE (Cont.)
Left
Right
WHI/ORN to 
Timer P4-4
RED/BLK to 
Right Solenoid
RED/BLK to 
Timer P4-7
WHI/YEL to 
Timer P4-5
RED/BLK to 
Left Solenoid
P612
Location:
  The solenoids are located on the mounting plate 
immediately beneath the hoppers.
Test Procedure:
1.  Unplug the grinder.
2.  Connect  a voltmeter across the left or right solenoid 
coil terminals. Plug-in the grinder. Momentarily 
press the Off/On/Start switch to “START” (lower) 
position and release (hopper selector switch must 
be corresponding to the suspect solenoid). The 
indication must be 120 volts ac for 120V models 
and 230 volts ac for 230V models.
3.  Unplug the grinder.
If voltage is present as described, proceed to #4.
If voltage is not present as described, refer to the Wiring 
Diagram and check the grinder wiring harness.
4.  Separate the connectors on the white/brown  wires 
of the solenoids from the connectors on the grinder 
wiring harness (RED/BLK) and the limit thermo-
stat.
5.  Check for continuity across the white/brown  wires 
on the suspect solenoid coil.
If continuity is present as described, reconnect the 
white/brown wires to the grinder wiring harness, and 
proceed to #6.
If continuity is not present as described, replace the 
solenoid.
6.  Check for continuity across the terminals of the 
limit thermostat.
P608
If continuity is present as described, reconnect the 
wires, and proceed to #7.
If continuity is not present as described, replace the 
limit thermostat.
7.  Check the solenoid for coil action when the control 
switch is momentarily pressed to the “START” 
(lower) position and released.  Plug-in the grinder.  
Listen carefully in the vicinity of the solenoid for 
a “clicking” sound as the coil magnet attracts and 
after a period of time, repels the plunger.
8.  Unplug the grinder.
If the sound is heard as described and the plunger 
remains unable to move or move freely, refer to the 
slide plate section.
If the sound is not heard as described, replace the 
solenoid.
Removal and Replacement:
1.  Remove the hopper assy from the grinder.
2.  Remove the four 8-32 slotted-head screws holding 
the solenoid coil to the solenoid panel.
3.  Feed the white/brown wires through the hole in the 
solenoid mounting plate and loosely install the new 
solenoid coil.
4.  Look through the collector on the bottom of the 
assy and adjust the slide plate travel distance when 
installing the solenoid coil.
5.  Push the solenoid plunger into the solenoid coil 
with your hand while moving the coil forward or 
backward in its mounting holes.
6.  Securely tighten the mounting screws when the 
slide plate appears to have no metal showing in 
the front or back of the hopper hole.
7.  Refer to the following illustration when reconnect-
ing the wires.
Solenoids (Models MHG, FPG-2 DBC, LPG-2, G9-2, G9-2 DBC)
FIG 46 SOLENOIDS
FIG 47 SOLENOID TERMINALS
41545 122209