Bunn CDBC-APS ユーザーズマニュアル

ページ / 32
Page 10
Will not fill or refill
PROBABLE CAUSE
REMEDY
PROBLEM
1.  Power  off  to  brewer  (CDBC-
APS/TS/TSR & CEZ-APS/TS/TSR)
2. Water shut off (CDBC-APS/TS/
TSR & CEZ-APS/TS/TSR)
3.  Display  flashing  (CDBC-APS/
TS/TSR)  or  ready  light  flashing
(CEZ-APS/TS/TSR)
4. ON/OFF Switch (CDBC-APS/TS/
TSR & CEZ-APS/TS/TSR)
5. Lime build up on Probe (CDBC-
APS/TS/TSR & CEZ-APS/TS/TSR)
6.  Refill  Valve  or  Control  Board
(CDBC-APS/TS/TSR & CEZ-APS/
TS/TSR)
Press ON/OFF switch on control
panel to determine if power is ON.
Make sure water is ON.
Brewer  has  shut  down  due  to
malfunction (See Diagnostic Chart
in manual, Page 19, or under top
lid of brewer).
Make sure ON/OFF Switch is "ON"
and indicator is lit.
Remove the Probe and check for
lime  deposit  on  tip.  Clean  and
reinstall.
Disconnect  the  brewer  from  the
power source and remove wires
from  refill  valve  coil.  Check  for
continuity across the terminals of
the solenoid coil. If continuity is
not present, replace the refill valve
(See  page  30).  If  continuity  is
present,  the  valve  may  be  stuck
closed. Shut water off to brewer.
Set the ON/OFF switch to the "OFF"
position. Open the faucet and drain
water down in the tank until flow
stops or slows to a trickle. Attach
a voltmeter to the terminals of the
refill solenoid. Connect the brewer
to  the  power  source.  Press  the
switch "ON". Within five seconds,
voltage should be present at the
solenoid  terminals.  If  voltage  is
not  present,  refer  to  the    wiring
diagrams  and  check  the  wiring
harness.
TROUBLESHOOTING (cont.)
REFILL CIRCUIT
29253 071599