PAGE 42 — DCA-400SSK — PARTS AND OPERATION MANUAL  (STD)— REV. #3  (09/17/01)
General Inspection Prior to Operation
The DCA-400SSK  generator has been thoroughly inspected
and accepted prior to shipment from the factory. However,
be sure to check for damaged parts or components, or loose
nuts and bolts, which could have occurred in transit.
Extension Cable
When electric power is to be provided to various tools or
loads at some distance from the generator, extension
cords are normally used. Cables should be sized to allow
for distance in length and amperage so that the voltage
drop between the generator and point of use (load) is held
to a minimum. Use the Cable Selection Guide (Table 10)
as a guide for selecting proper cable size.
Circuit Breakers
To protect the generator from an overload, a 3-pole,1000
amp, main 
main 
main 
main 
main circuit breaker is provided to protect the UVW
output terminals from overload. In addition two single-pole,
20 amp GFCI
GFCI
GFCI
GFCI
GFCI circuit breakers are provided to protect the
GFCI receptacles from overload. Three 50 amp load
load
load
load
load circuit
breakers have also been provided to protect the load side of
the generator from overload.  Make sure to switch ALL
ALL
ALL
ALL
ALL circuit
breakers to the "OFF" position prior to starting the engine.
DCA-400SSK — PRE-SETUP
 ALWAYS consult with a licensed
electrician for correct extension
cord wire size.
NOTE