When using the vacuum pump
For method of using a manifold valve, refer to its operation manual.
1.  Completely tighten the flare nuts, 
A, B, C, D, connect the manifold 
valve charge hose to a charge port 
of the low-pressure valve on the 
gas pipe side.
2.  Connect the charge hose 
connection to the vacuum pump.
3.  Fully open the handle Lo of the 
manifold valve.
4.  Operate the vacuum pump to 
evacuate. After starting 
evacuation, slightly loose the flare 
nut of the Lo valve on the gas pipe 
side and check that the air is 
entering (Operation noise of the 
vacuum pump changes and a 
compound meter indicates 0 
instead of minus)
5.  After the evacuation is complete, 
fully close the handle Lo of the 
manifold valve and stop the 
operation of the vacuum pump. 
Make evacuation for 15 minutes or 
more and check that the 
compound meter indicates -
76cmHg (-1x10 Pa).
6.  Turn the stem of the packed valve 
B about 45o counterclockwise for 
6~7 seconds after the gas coming 
out, then tighten the flare nut 
again. Make sure the pressure 
display in the pressure indicator is 
a little higher than the atmosphere 
pressure.
7.  Remove the charge hose from the 
Low pressure charge hose.
Vacuum pump
Charge hose
Manifold valve
-76cm/Hg
Charge
hose
Handle Lo
Handle Hi
Outdoor unit
Indoor unit
8.  Fully open the packed valve stems 
B and A.
9.  Securely tighten the cap of the 
packed valve.
27 electrolux electrical work
Electrical safety
Perform the electric safe check after completing installation:
Gas leak check
Soap water method
Apply a soap water or a liquid neutral 
detergent on the indoor unit 
connection or outdoor unit 
connections by a soft brush to check 
for leakage of the connecting points 
of th piping. If bubbles come out, the 
pipes have leakage.
Leak detector
Use the leak detector to check for 
leakage.
Caution
A: Lo packed valve, B: Hi packed 
valve C and D are ends of indoor unit 
connection.
1. Insulated resistance: The insulated resistance must be more than 2M    .
2. Grounding work: After finishing grounding work, measure the grounding 
resistance by visual detection and grounding resistance tester. Make sure the 
grounding resistance is less than 4    .
3. Electrical leakage check (performing during test running): During test 
operation after finishing installation, the serviceman can use the electroprobe 
and multimeter to perform the electrical leakage check. Turn off the unit 
immediately if leakage happens. Check and find out the solution ways till the 
unit operate properly.
electrical safety
 electrolux 28
Cover
indoor unit
check point
Outdoor unit
check point