Frigidaire FFHT1725LK インストール手順

ページ / 3
This document should only be removed by customer after installation. 
P/N: 240568304
Not satisfied with the installation of your refrigerator?
   Please contact the store you purchased it from.
Installation Instructions for Top Mount Refrigerator
2
3
To connect the water supply to the rear of your 
refrigerator:
  1  Ensure that the refrigerator is not plugged in.
  2  Flush the supply line until water is clear by placing the end 
of the copper tube in a sink or bucket and opening the 
shut-off valve.
  3  Remove the plastic cap from the water valve inlet at the 
rear of your refrigerator. Discard the cap.
  4  Slide the brass compression nut, then the ferrule (sleeve) 
onto copper tube.
  5  Push the copper tube into water valve inlet as far as it will 
go (
1
/
4
 inch).
  6  Slide the ferrule (sleeve) into valve and finger-tighten the 
compression nut onto valve. Tighten another half turn 
with a wrench. Do not over-tighten.
  7  Secure the copper tube to your refrigerator’s rear panel 
with a steel clamp and screw (see illustration).
  8  Coil the excess copper tubing (about 2½ turns) behind your refrigerator as shown. Arrange 
coiled tubing to avoid vibration or wear against other surfaces.
  9  Open water supply shut-off valve and tighten any connections that leak. 
5
Remove Internal Shipping Materials
7
8
  
1
4
6
9
Doors
 Handles are secure and tight
 Door seals completely to cabinet on all
      sides
 Freezer door is level across the top
Leveling
 Refrigerator is level, side to side and tilted
      1/4” (6mm) front to back
 Toe grille is properly attached to
      refrigerator
 Cabinet is setting solid on all corners
Electrical Power
 House power turned on
 Refrigerator plugged in
Ice Maker
 House water supply connected to
      refrigerator
 No water leaks present at all connections 
      - recheck in 24 hours
 Ice Maker is turned ON.
Final Checks
 Shipping material removed
 Fresh Food and Freezer controls set
 Crisper Humidity controls set
 Registration Card sent in
 Installation Checkoff List
Prepare The Installation Site
Transport Unpackaged Refrigerator To Site
Location of these materials may vary depending on your model.
Plastic
Putty
Knife
Adjustable
Wrench
Socket
Wrench Set
OR
Phillips head
or
Quadrex head
screwdriver
Tools Necessary:
Pliers
Awl
(OR)
Include these minimum guidelines in your site 
preparation:
  •  Choose a place near a grounded electrical 
outlet.
  •  Do not use an extension cord or an adapter 
plug.
  •  Avoid direct sunlight and close proximity to a 
range, dishwasher or other heat source.
  •  Floor should be level and able to support a fully 
loaded refrigerator.
Allow the following clearances for ease of installation, 
proper air circulation, and plumbing and electrical 
connections:  
Sides & Top: 3/8 inch 
Rear: 1 inch
By now, you have already removed your refrigerator’s shipping carton. 
You may still need to use a hand truck to move it through close spaces or 
entrances. If the refrigerator is larger than an entrance, consider two options:
  •  Remove the entrance door if one exists.
  •  Remove the refrigerator doors (see how in your Use & Care Guide). 
When using a hand truck:
  •  Load refrigerator from side of cabinet only.
  •  Do not run retaining straps over handles.
  •  Do not over-tighten retaining straps.
  •  Never use refrigerator handles to move the 
refrigerator.
  •  Remove tape from doors only after unit is in place.
Connect Water Supply
What you will need:
  •  Access to a cold water 
line with pressure of  
30-100 psi.
  •  Copper tubing with 
¼-inch (6.4mm) OD. 
Length for this tubing is 
the distance from the rear of the refrigerator 
to your household water supply line plus 7 
feet (2.1 meters). 
  •  A shut-off valve for the connection between 
your household water line and the refrigerator 
supply line. Do not use a self-piercing shut-off 
valve.
  •  A compression nut and ferrule (sleeve) for the 
water supply connection at the rear of your 
refrigerator.
Place In Permanent Position
If possible, use a hand truck to position the refrigerator directly in front of its cabinet enclosure. 
Be careful not to move the refrigerator beyond its water supply (copper tubing) connections.
Plug in the power cord, and push the refrigerator 
straight back into place.
Level Refrigerator & Adjust Doors 
(if necessary)
Guidelines for final positioning of your refrigerator:
  •  All four corners of the cabinet must rest firmly on the floor.
  •  The cabinet should be level at the front and rear.
  •  The sides should tilt ¼-inch (6 mm) from front-to-back (to ensure 
that doors close and seal properly).
  •  Doors should align with each other and be level.
To level the cabinet using the front rollers:
  1  Remove the toe grille.
  2  Use a flat-blade screwdriver or 
3
/
8
 inch socket wrench to raise or 
lower the front rollers.  Use adjustable wrench to adjust leveling 
screws.
We use packing foam and tape to secure the internal parts of your refrigerator for shipping. 
Once the refrigerator is in position, you can remove this material.
Controls
When changing controls, wait 24 hours before making additional adjustments.
Door Removal (if necessary)
If you need to remove the doors to get your refrigerator into the house, please see “Door 
Removal Instructions” in your Use & Care Manual. 
WARNING
To avoid electric shock, which can cause death or severe personal injury, do not connect your 
refrigerator to an electrical power source until you have completed Step 3 of these instructions.
CAUTION
Room temperatures below 55°F 
(13°C) or above 110°F (43°C) 
will impair cooling ability of your 
refrigerator’s compressor.
IMPORTANT
If you are installing your refrigerator without 
connecting it to a water supply, make sure the ice 
maker’s power switch is turned Off (see the Use & 
Care Guide for more details).
NOTE
These installation instructions 
are provided only as a possible 
customer option. We recommend 
that you use a service or kitchen 
contracting professional to install 
your refrigerator.
NOTE
Information about cabinetry 
construction for your new appliance 
is available for contractors. Call 
1-877-435-3287.
CAUTION
Shifting the refrigerator from side to 
side may damage flooring.
NOTE
Kit #53039117950, available from your 
dealer, provides all materials for a water 
supply installation, including 25 feet of 
copper tubing and full instructions.
CAUTION
To avoid property damage:
•  Use copper tubing for the water supply line 
(plastic tubing is more likely to leak).
•  Ensure water supply complies with local 
plumbing codes.
CAUTION
•  Shifting the refrigerator from side 
to side may damage flooring.
•  Do not block the toe grille on the 
lower front of your refrigerator. 
Sufficient air circulation is essential 
for proper operation.
NOTE
•  The ice maker’s fill valve may operate noisily if the household water supply is shut off.
•  After ensuring no water leaks exist at any connection, be sure to check for leaks again in 24 
hours. 
Toe Grille
Raise
Stationary Front Roller 
with Leveling Screw 
(some models)
Adjustable Front Roller
(some models)
NOTE
Raise the front of the refrigerator enough so the doors close freely 
when opened halfway.  The refrigerator should slope 
1
/
4
 inch to 
1
/
2
 
inch from front-to-back.  Then level the refrigerator from side-to-
side.
Humidity 
Control
Top 
Hinge 
Cover
Top 
Hinge
Center 
Hinge
Shim
Pin
Door
Stop
Door Stop
Screw
Hinge
Pin
Screws
Bottom
Hinge
Toe Grille
Washer