Alcatel-Lucent 6850-48 補足マニュアル
Managing CMM Directory Content
Managing the Directory Structure (Non-Redundant)
OmniSwitch AOS Release 6 Switch Management Guide
September 2009
page 5-17
Rebooting from the Working Directory
Besides a regular boot of the switch (from the certified directory), you can also force the switch to boot
from the working directory. This is useful for checking whether a new configuration or image file will
boot the switch correctly, before committing it to the certified directory. (For information on saving the
working directory to the certified directory, see
from the working directory. This is useful for checking whether a new configuration or image file will
boot the switch correctly, before committing it to the certified directory. (For information on saving the
working directory to the certified directory, see
.)
The following picture illustrates the case of a switch being rebooted from the working directory:
In the above diagram:
1 The certified directory is used to initially boot the switch.
2 Changes are made to the configuration file and are saved to the configuration file in the working direc-
tory by using the
tory by using the
command, described in the section
3 The switch is rebooted from the working directory by using the
command.
When a reload working command is entered, the switch prohibits a takeover from the secondary CMM.
Switch functions are suspended until the boot process is complete.
Switch functions are suspended until the boot process is complete.
If you decide against using the new software booted from the working directory, the switch can revert to
the software stored in the certified directory by using the
the software stored in the certified directory by using the
command as described
, or by using the reload
.
Working
Certified
Running
Primary CMM
1
2
3