Netopia r6100 参照ガイド
![Netopia](https://files.manualsbrain.com/attachments/0c1500955c1d77464daaf21b9689115df0612ef9/common/fit/150/50/aa320cfd1ac4f696de994400d2856c456aca1b6fa1e545336dd10887fb77/brand_logo.jpeg)
3-6 User’s Reference Guide
LEDs start-up sequence
The WAN 1 Management status light (LED #2 in the figure above) displays the status of the Netopia R6000
Series’ attempt to connect to the DSLAM.
Series’ attempt to connect to the DSLAM.
When the router is powered on:
■
Initially the WAN 1 Management LED and the WAN1 Channel 1 LED (LED #4 in the figure above) are dark.
■
The WAN 1 Ready LED (LED #3 in the figure above) begins to blink red as the router attempts to establish
communication with the WAN inter face.
communication with the WAN inter face.
■
The WAN 1 Ready LED goes solid green once it establishes communication with the WAN inter face.
■
The WAN 1 Management LED will then be either solid yellow (no signal from DSLAM) or flashing yellow;
then be dark between training attempts for a total cycle time of 3 seconds; then repeat as it trains.
then be dark between training attempts for a total cycle time of 3 seconds; then repeat as it trains.
■
Once trained, the WAN 1 Management LED goes dark, and the WAN 1 Channel 1 LED will be solid green.
It will flash yellow for traffic.
It will flash yellow for traffic.