Champion uh-100b インストール手順

ページ / 84
iii
Manual Revisions  __________________________________________________ i
Limited Warranty ___________________________________________________ii
Model Descriptions ________________________________________________ iv 
Installation _______________________________________________________ 
   
 
Unpack and Place
  Electrical Connections 
   
1 Phase to 3 Phase Field Conversion for UH100B, UH170B,UH200B Only  
   
(Beginning with S/N W14236 and above)
  Water Connections
  Drain Connections
  Chemical Dispensers
 
Initial Start-up  ___________________________________________________ 17 
 
Operation _______________________________________________________ 21 
  Operation
  Cleaning
  Maintenance
 
Troubleshooting  _________________________________________________ 25 
Service Replacement Parts  ________________________________________ 27 
Electrical Schematics _____________________________________________ 67 
Timer Charts  ____________________________________________________ 73
Table of Contents
 
Table of Contents