MAINTENANCE
PREVENTATIVE MAINTENANCE SCHEDULES
Daily Maintenance Requirements
1. Check the chemical supply containers and replenish as needed.
2. Inspect the scrap screens and baskets for bent or damaged parts.
3. Check the spray arm bearings and make sure that arms turn freely.
4. Check pump motor for leaks around shaft.
5. Check thermometers for proper readings.
Weekly Maintenance Requirements
1. Inspect for leaks including all piping and supply connections. Tighten or repair as needed.
2. Inspect the door for proper fit and ease of operation.
3. Check the operation of door safety switches.
4. Thoroughly clean any residue from the exterior of machine.
5. Check drain/overflow tube for leaks.
Semi-Annual Maintenance Requirements
1. Inspect all chemical connections and supply tubing for leaks.
2. Check the building drain system and clean as needed.
Yearly Maintenance Requirements
1. Inspect the installation site for cleanliness and any foreign material around the machine. Clean
as required.
2. Check the overall condition of the machine. Replace any worn or damaged parts.