Zhone 2000 ユーザーガイド

ページ / 296
T r o u b l e s h o o t i n g   a n d   D i a g n o s t i c s
199
Hotline Test
The hotline test allows line-to-line telephone connections on a single IAD 
without requiring a gateway connection on the WAN port.To perform a 
hotline test, follow the steps below.
1
Type “H” on the POTS Diagnostics menu to select Hotline Test. The IAD 
displays the following prompt:
Perform an all-lines test? (Y or N):
2
Type “Y” to enable automatic line connection. The IAD informs you the 
test has started. Proceed to step 6. 
− or −
Type “N” to connect two specific ports. The IAD prompts you for the first 
port.
3
Type the port and press Enter. The IAD prompts for the second port.
4
Type the port and press Enter. The IAD informs you that the lines are 
connected and the test is started:
Lines 1 and 2 are connected together
Lines 3 and 4 are connected together
Lines 5 and 6 are connected together
Lines 7 and 8 are connected together
Hotline test started
5
Press Escape to terminate the test. The IAD terminates the test and displays 
the POTS Diagnostics menu.
Ring Test 
The ring test verifies that the POTS device attached may be rung by the IAD. 
To perform a ring test, follow the steps below.
1
Type “R” on the POTS Diagnostics menu to select Ring Test. The IAD 
displays this prompt:
Ring all lines? (YN or ESC):
2
Enter “Y” to proceed, or “N” or Escape to abort and return to the menu. 
THe IAD displays this prompt:
Ring lines concurrently or sequentially? (CS or 
ESC):
3
Enter “C” (concurrent), “S” (sequential), or Escape.
4
Listen for the rings to occur, and press Escape to terminate the test. The 
IAD terminates the test and displays the menu.
Ring Test
The ring test rings all voice port lines either simultaneously or individually, in 
sequence. To perform a ring test, follow the steps below.
1
Type “R” on the POTS Diagnostics menu to select Ring Test. The IAD 
displays the following prompt: