Zhone 2000 ユーザーガイド

ページ / 296
206
2 0 0 0 - A 2 - G B 2 3 - 0 0
Testing the IAD
1
Verify the WAN link status:
SDSL Interface—the LINK indicator blinks while the IAD synchronizes with 
the DSLAM, and lights continuously when the link is established.
T1/E1 Interface—the LINK indicator blinks while the IAD synchronizes 
with the voice gateway, and lights continuously when the link is 
established. 
2
Connect a POTS telephone to a provisioned line port on the IAD.
3
Lift the telephone receiver and check for dial tone. If no dial tone is present, 
4
Repeat steps 2 and 3 for each provisioned line port.
5
Disconnect the telephone once you are through testing the line ports.
6
Use a crossover cable to connect the PC to the Ethernet LAN port on the 
IAD. Determine that the PC is configured with an IP address on the same 
subnet as the IAD.
7
Observe that the LINK indicator on the IAD front panel lights to verify that 
the IAD is connected to the LAN.
8
Run Ping on the PC to ping a known good address on the IAD and verify the 
acknowledgement. If a timeout occurs, troubleshoot the LAN path to the 
IAD.
9
Ping a known good address on the network and wait for acknowledgement.
If a timeout occurs, troubleshoot the LAN path to the IAD.
10
Disconnect the Ethernet cable between the PC and the IAD.
11
Using a straight-through cable, connect the Ethernet LAN port on the IAD 
to your local LAN patch panel or hub|switch|router.
12
Connect the IAD telephone ports to the local distribution frame or patch 
panel.
The IAD is ready for service.
Maintenance
The IAD menu interface contains utilities reserved for factory maintenance 
and development. Before running any System Utilities, consult your technical 
support representative.
Displaying the Current Configuration
To display the current configuration and data transmission status, follow the 
steps below.
1
On the Main menu, type “1” to display the Reports menu.