Zhone 2000 ユーザーズマニュアル

ページ / 297
2000-A2-GB20-10
- 9 -
February 2004
Unpacking 
the IAD
Each IAD is packed and shipped in a durable container. If you haven’t 
already done so, open the container and unpack the IAD. Carefully 
remove the IAD from the package and packing material. 
IAD Package Components
Each IAD is shipped with the components listed below. As you unpack 
them, note their condition and identity, and compare the list to the packing 
list in the package.
‹
AC power adapter and cord (6 feet long), or AC power cord
‹
Agency Compliance information sheet
‹
Ethernet cable (straight through), 7 feet long
‹
WAN cable (varies by interface), 7 feet long
If you note any visible damage, or components are missing, notify the 
shipping company immediately to make a damage claim. Contact the 
company from which the IAD was purchased to obtain a Return Material 
Authorization (RMA) for return of damaged equipment, or to order missing 
components. 
Installing 
the IAD
After you unpack the IAD, find a suitable location to install the IAD in the 
customer’s premises. Ideal locations include computer equipment room, or 
a telephone or wiring closet. You can locate the IAD in an equipment rack, 
on a table or shelf, or it may be wall-mounted. Install the IAD in a location 
that is generally protected and the IAD will be undisturbed. 
AC Power and Uninterruptible Power Supply
The IAD requires access to AC power (NEMA 15-3R). Make sure the IAD 
is located within six feet of an AC power outlet. Locate the nearest power 
outlet and plug in the supplied AC power adapter or AC power cord. If 
there is an uninterruptible power supply on premises, plug the AC power 
adapter or cord into that power source.
Ensure that the power cord conveniently and safely reaches the rear panel 
of the IAD where the power plug or adapter jack is located. 
Clearance Requirements
If you install the IAD horizontally, make sure you maintain at least 2 inches 
of horizontal distance from other IADs or other electronic equipment, to 
ensure adequate ventilation and heat dissipation. If you install the IAD 
 
NOTE
We suggest you keep the shipping container and packing 
material for future shipping or storage of the unit.
LAN LINK
LAN ACT
WAN LINK
VOICE
POWER
2/4/8-Port
Do not attach the AC power adapter, or power up the unit at 
this time.
LAN LINK
LAN ACT
WAN LINK
VOICE
POWER
16/24-Port
Plug in the power cord, but do not power up the unit