Zhone 7995 ユーザーガイド

ページ / 154
7. Testing
7990-A2-GB20-00
May 2002
7-13
Ending an Active Test
A test initiated by the user can be ended using:
„
Test Timeout option – Enable the Test Timeout system option so the unit can 
automatically terminate tests, and set the Test Duration (min) option to specify 
the amount of time that tests can run before the unit terminates the test. The 
default is 10 minutes. Refer to 
„
Command column – Under the Command column on any test screen, 
position the cursor at Stop next to the active test and press Enter to stop a 
specific test. 
„
Abort All Tests menu selection – Select Abort All Tests from the Test menu 
to stop all tests running on all interfaces. 
Command
 
Complete
 appears 
when all tests on all interfaces have been terminated. Network-initiated 
loopbacks cannot be stopped from the Test menu.
An aborted test may continue to run for a few seconds as the Stop command is 
sent to the remote end and processed.