Zhone 2004 ユーザーガイド

ページ / 216
V e r i f i c a t i o n
8-1
C
H A P T E R
C
HAPTER
 8
V
ERIFICATION
This chapter describes how to verify that the JetFusion IAD operates properly 
after installation. It also covers maintenance and how to display the current 
configuration. Before you can test the voice capabilities of the JetFusion IAD, 
you must first provision it at the voice gateway and configure the voice 
application and parameters as described beginning on page 4-35.
Power-up Test
The JetFusion IAD displays an indication of normal operation when you first 
power it up. When you power it up, verify that the POWER indicator on the 
front panel lights green.
Operational Test
Follow the procedure below to verify that the IAD is operating properly after 
installation. This procedure assumes that
You have configured Directory numbers (DNs) in the Class 5 switch for the 
associated Voice Ports.
The IAD has been connected to a terminal emulator via the console port, 
displays the normal boot sequence and you can log in.
You have configured PVCs at the DSLAM (default data = 0, 38; default 
voice is 0, 39) when using ATM. 
You have provisioned a data network. 
You connected and configured a WAN link at the associated DSLAM or 
voice gateway. For more information, see WAN Configuration on page 4-2. 
You have a PC with Telnet, and an Ethernet adapter running TCP/IP. For 
more information, see Connecting via Telnet on page 2-9.
For testing, you and a counterpart logged on to the upstream voice gateway 
can communicate via telephone or cell phone.