Gestetner dsm651 操作ガイド

ページ / 172
Connect Copy
94
3
Connect Copy Job Flow
The job flow depends on the status of
the two machines.
When One of the Two 
Machines is Idle
One of the machines is copying Orig-
inal A.
Using the idle machine as the main 
machine (Connect Copy)
AAAA
Make Connect Copy settings for
Original B on machine <2> (the
idle machine).
BBBB
Machine <2> begins  copying
Original B. Machine <1> also
starts copying Original B when it
has finished with Original A.
1.
Sub-machine
2.
Main machine
Using the machine currently copying as 
the main machine (Connect Copy: Job 
Preset)
AAAA
Make Connect Copy settings for
Original B on machine <1> (the
machine currently in use).
KHCONR1E
KHCONRBE
KHCONR3E
KHCONR2E
MartiniC2_EN_Copy-F1_FM.book  Page 94  Tuesday, July 27, 2004  1:43 PM