Aten PN5320 DCP2942 クイック設定ガイド

製品コード
DCP2942
ページ / 2
Package Contents
1
3
Hardware Review (Port and LED Panel)
The PN5212/PN5320 package consists of:
1 PN5212 or PN5320 Power Distribution Unit
3 Serial Adapters
   1 SA0149 (RJ45F to DB9F)
   1 SA0150 (RJ45F to DB9M)
   1 SA0151 (RJ45F to DB9F)
Single Stage Installation
In a single stage installation, there are no additional PN5212 / PN5320 stations daisy chained down from 
the first unit. To set up a single stage installation, refer to the installation diagram (the numbers in the 
diagram correspond to the numbered steps), and do the following
1. Use a grounding wire to ground the PN5212 / PN5320 by connecting one end of the wire to its 
grounding terminal, and the other end of the wire to a suitable grounded object.
Note: Do not omit this step. Proper grounding helps to prevent damage to the unit from surges or static 
electricity.
2. For each device you want to connect, use its power cable to connect from the device's AC socket to 
any available outlet on the PN5212 / PN5320. 
3. Plug the cable that connects the PN5212 / PN5320 to the LAN into the PN5212 / PN5320's LAN port.
4. (Optional) If you wish to use a console terminal connection, use Cat 5e cable to connect the PN5212 / 
PN5320’s PON IN/Console port to the SA0151(DTE) adapter supplied with your package. Connect 
the adapter’s serial connector to the COM port of the computer you will use for the console terminal.
5. Connect the PN5212/PN5320’s power cord to an AC power source.
Note: We strongly advise that you do not plug the PN5212/PN5320 into a multi socket extension cord, 
since it may not receive enough amperage to operate correctly.
Once you have finished these installation steps, you can turn on the PN5212 / PN5320 and the connected 
devices.
Note: We strongly recommend using cable ties and cable bars to safely and securely route the cables 
attached to the back of the unit.
Hardware Installation
5-2
Rack Mounting
The PN5212 / PN5320 can be installed in a 0U configuration on the side of a rack.  To rack mount 
the device, use the rack mounting brackets that came with your device.
   
1. The brackets can be mounted either on the back panel, or the top and bottom of the device.   
2. L bracket, mounting style 1
3. L bracket, mounting style 2
4. Z bracket, mounting style 1, 
front and rear view.
5-1
Hardware Installation
1. Station Selection
2. Readout Section 
3. Status LEDs and Reset Switch
4. LAN Port
5. PON Out Port
6. RS-232/RS-485 Switch
7. PON In / Console Port
• Browsers accessing the PN5212 / PN5320 must support SSL 128 bit encryption.
• For cold booting of attached computers, the computer's BIOS must support Wake on LAN or 
System after AC Back.
• For Safe Shutdown:
• The computer must be running Windows (Windows 2000 or higher), Linux.
• The safe shutdown AP (available by download from our website or from the software CD 
included), must be installed and running on the computer
PN5212/PN5320 Power Distribution Unit 
Quick Start Guide
© Copyright 2011 ATEN
®
 International Co., Ltd.   www.aten.com
Altusen and the Altusen logo are trademarks of ATEN International Co., Ltd. 
All rights reserved. All other trademarks are the property of their respective owners.
This product is RoHS compliant    
PAPE-1215-401G              Printing Date: 07/2011
Online Registration
International:
• http://support.aten.com
North America:
• http://www.aten-usa.com/product_registration  
 
Technical Phone Support
International:
• 886-2-86926959
China:
• 86-10-5255-0110
Japan:
• 81-3-5323-7178
Korea:
• 82-2-467-6789
North America:
• 1-888-999-ATEN  (ATEN TECH)
• 1-732-356-1703  (ATEN NJ) 
United Kingdom:
• 44-8-4481-58923
Requirements
4
2 Rack Mount Kit
1 Grounding Wire
1 User Manual 
1 Quick Start Guide
1 Software CD
Note: The Front View diagram depicts a PN5320. The PN5212 is basically the same, except there are 
only 12 AC power sockets (6 on each side of the Port and LED panel), and all the sockets are 
NEMA 5-15R or IEC320 C13. There are no NEMA 5-20R or IEC320 C19 sockets
1. Power Sockets (17 x NEMA 5-15R or 17 x IEC C13)
2. Port and LED Panel
3. Power Sockets (3 x NEMA5-20R or 3 x IEC C 19)
4. Circuit Breaker
5. Grounding Terminal
6. Power Cord 
Hardware Review (Front View)
2
PN5320 - NEMA
PN5320 - IEC
1
2
3
4
5
6
7
3
5
4
2
1
SA0151
(DTE)
5. Z bracket, mounting style 2
1
3
1
4 5
6
2
2