Canon XU-81W マニュアル

ページ / 60
E15
3.  Checks after Completion of Connection
3-1. At the Unit Installation Site
Refer to the figure of “2. Connections” and check if all the cables are 
properly connected.
3-2.  At the Control Site
When OP-300 is used
To start operation
①  Press the POWER switch of the 
operation unit.
  (Check → The green LED lights.)
②  The TAKE switch lights up, and a head  
response is awaited.
  (Check → The TIME display LED 
indicates  
.)
The system waits for a response from the pan-tilt head. After a few seconds when 
communication with the pan-tilt head is established, the shot movement time is 
displayed (example: 11 s = 
) and the other switches are enabled.
To end operation
①  Press to turn off the POWER switch of the operation unit.
 
(Check → The green LED goes off.)
The operating procedures vary depending on the operation unit that is used. 
Please refer to the operation manual of your operation unit.
POWER
TIME
ALARM
MODEM
TEMP
SECONDS
TAKE
FAN
-
+
PAGE         1           2           3           4
A    B   C   D
SHOT
CAMERA
POWER
GAIN
L        H   1    2   S      F
OPERATION UNIT  OP-300
TAKE switch
POWER switch
TIME display LED