Netgear M4100-D12G (GSM5212v1h1) - 10‐port GE + 2 GE Combo L2 Managed PD Switch ハードウェアマニュアル

ページ / 33
Hardware Installation 
19
 NETGEAR Managed Switch
Install the M4100-D12G or M4100-D10-PoE Using Magnets
If you use the magnets (included) to install the M4100-D12G or M4100-D10-PoE switch 
to a vertical metal surface, the maximum height above the floor is 75 centimeters (29.5 
inches). Be sure to orient the switch as shown in the following figure. Exhaust air should 
come out the side of the switch case.
1. 
Attach the magnets to the switch using a No. 1 Phillips screwdriver and 4 screws 
(provided).
See the following figure. 
2. 
Press each of the 4 rubber feet firmly into the indentations on the bottom of the switch. 
3. 
Position the switch so that it is no more than 75 centimeters (29.5 inches) above the floor.