Netgear GSM7352Sv2- ProSAFE 48+4 Gigabit Ethernet L3 Managed Stackable Switch ハードウェアマニュアル

ページ / 39
  Chapter 2:  Hardware Installation    
|
    
21
Managed Stackable Switches GSM7200PS and GSM7300S Series Hardware Installation Guide
2. 
Verify that all cables are installed correctly.
3. 
Check cable routing to ensure that cables are not damaged and will not create a safety 
hazard.
4. 
Be sure that all equipment is mounted properly and securely.
Connect to Power and Check the LEDs
The switch does not have an On/Off switch. The only way to apply or remove power is to 
connect or disconnect the power cord. Before you connect the power cord, select an AC 
outlet that is not controlled by a wall switch (which can turn off power to the switch). 
After you select an appropriate outlet, follow these steps to apply AC power.
1. 
Connect one end of the AC power adapter cable to the rear of the switch, and the other 
end to a grounded 3-pronged AC outlet.
2. 
Check the Power LED on the front panel of the switch. The LED should light up in the 
following sequence:
•     
The LED turns yellow as the switch runs a Power-On Self-Test (POST). 
•     
If the switch passes the test, the LED turns green. The switch is working and ready to 
pass data. 
•     
If the POST fails, the Power LED blinks yellow. 
If the Power LED does not light up, check that the power cable is plugged in correctly and 
that the power source is good. For help with troubleshooting, see Chapter 3, 
Adapters and Modules Compatible with the 
High-Speed I/O Module Bays
The High-Speed I/O Module Bays can be used for inter-switch stacking or to install XFP
10-Gigabit Ethernet modules. If you want to do both, use one 24-Gigabit Stackable Module 
AX742 per switch, and then use the remaining module bay foran adapter and corresponding 
module supported by the switch.
You can install these adapters (sold separately) in the switches’ high-speed module bays:
•     
ProSafe 10-Gigabit Ethernet XFP Adapter Module AX741:
Figure 2-10  AX741