Cisco Cisco UCS B440 M1 High-Performance Blade Server 情報ガイド
Product End-of-Life Notice
© 2010 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information.
Page 1 of 3
End-of-Sale and End-of-Life Announcement for the Cisco UCS B200
M1 Blade Server
M1 Blade Server
EOL7260
Cisco announces the end-of-sale and end-of life dates for the Cisco UCS B200 M1 Blade Server. The last
day to order the affected product(s) is January 21, 2011. Customers with active service contracts will
continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the
EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected
product(s). Table 2 lists the product part numbers affected by this announcement. For customers with
active and paid service and support contracts, support will be available until the termination date of the
contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco UCS B200 M1 Blade Server
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to
the general public.
the general public.
October 22, 2010
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer
for sale after this date.
for sale after this date.
January 21, 2011
Last Ship Date:
HW
HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual
ship date is dependent on lead time.
ship date is dependent on lead time.
April 21, 2011
End of Routine Failure
Analysis Date:
HW
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to determine the cause of
hardware product failure or defect.
hardware product failure or defect.
January 21, 2012
End of New Service
Attachment Date:
HW
Attachment Date:
HW
For equipment and software that is not covered by a service-and-support contract, this is the last
date to order a new service-and-support contract or add the equipment and/or software to an existing
service-and-support contract.
date to order a new service-and-support contract or add the equipment and/or software to an existing
service-and-support contract.
January 21, 2012
End of Service Contract
Renewal Date:
HW
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
April 18, 2015
Last Date of Support:
HW
HW
The last date to receive service and support for the product. After this date, all support services for
the product are unavailable, and the product becomes obsolete.
the product are unavailable, and the product becomes obsolete.
January 31, 2016
HW = Hardware
OS SW = Operating System Software App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part
Number
Number
Product Description
Replacement Product
Part Number
Part Number
Replacement Product
Description
Description
Additional
Information
Information
N20-B6620-1
UCS B200 M1 Blade Server
without CPU, memory, HDD,
mezzanine
without CPU, memory, HDD,
mezzanine
N20-B6625-1
UCS B200 M2 Blade Server without
CPU, memory, HDD, mezzanine
CPU, memory, HDD, mezzanine
--
N20-B6620-1-UPG
UCS B200 M1 Blade Server
without CPU, memory, HDD,
mezzanine
without CPU, memory, HDD,
mezzanine
N20-B6625-1-UPG
UCS B200 M2 Blade Server without
CPU, memory, HDD, mezzanine
CPU, memory, HDD, mezzanine
--
N20-B6620-1=
UCS B200 M1 Blade Server
without CPU, memory, HDD,
mezzanine
without CPU, memory, HDD,
mezzanine
N20-B6625-1=
UCS B200 M2 Blade Server without
CPU, memory, HDD, mezzanine
CPU, memory, HDD, mezzanine
--
N20-B6620-1D
UCS B200 M1 Blade Server
without CPU, memory, HDD,
mezzanine
without CPU, memory, HDD,
mezzanine
N20-B6625-1D
UCS B200 M2 Blade Server without
CPU, memory, HDD, mezzanine
CPU, memory, HDD, mezzanine
--