Cisco Cisco Application Extension Platform for SRE 情報ガイド
Product End-of-Life Notice
© 2009 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information.
Page 1 of 2
End-of-Sale and End-of-Life Announcement for the Cisco Application
Runtime Environment Advanced Integration Module
Runtime Environment Advanced Integration Module
EOL6876
Cisco announces the end-of-sale and end-of life dates for the Cisco Application Runtime Environment
Advanced Integration Module . The last day to order the affected product(s) is March 31, 2010. Customers
with active service contracts will continue to receive support from the Cisco Technical Assistance Center
(TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions,
and dates for the affected product(s). Table 2 lists the product part numbers affected by this
announcement. For customers with active and paid service and support contracts, support will be
available until the termination date of the contract, even if this date exceeds the Last Date of Support
shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco Application Runtime Environment Advanced Integration Module
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed
to the general public.
to the general public.
September 30, 2009
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no
longer for sale after this date.
longer for sale after this date.
March 31, 2010
Last Ship Date: HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers.
Actual ship date is dependent on lead time.
Actual ship date is dependent on lead time.
June 29, 2010
End of SW Maintenance
Releases Date: HW
Releases Date: HW
The last date that Cisco Engineering may release any final software maintenance releases or
bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the
product software.
bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the
product software.
March 31, 2011
End of Routine Failure
Analysis Date: HW
Analysis Date: HW
The last-possible date a routine failure analysis may be performed to determine the cause of
product failure or defect.
product failure or defect.
March 31, 2011
End of New Service
Attachment Date: HW
Attachment Date: HW
For equipment and software that is not covered by a service-and-support contract, this is the last
date to order a new service-and-support contract or add the equipment and/or software to an
existing service-and-support contract.
date to order a new service-and-support contract or add the equipment and/or software to an
existing service-and-support contract.
March 31, 2011
End of Service Contract
Renewal Date: HW
Renewal Date: HW
The last date to extend or renew a service contract for the product.
June 26, 2014
Last Date of Support:
HW
HW
The last date to receive service and support for the product. After this date, all support services
for the product are unavailable, and the product becomes obsolete.
for the product are unavailable, and the product becomes obsolete.
March 30, 2015
HW = Hardware
OS SW = Operating System Software App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product
Part Number
Part Number
Product Description
Replacement Product
Part Number
Part Number
Replacement Product Description
Additional
Information
Information
AIM-APPRE-102-K9
Application Runtime Engine AIM
AIM2-APPRE-104-K9
Application Runtime Engine AIM
—
AIM-APPRE-102-K9=
Application Runtime Engine AIM
AIM2-APPRE-104-K9
Application Runtime Engine AIM
—
Product Migration Options
Customers are encouraged to migrate to the Cisco Application Runtime Environment Advanced Integration Module 2
(AIM2-APPRE-104-K9). Information about this product can be found at:
http://cisco.com/go/axp
.