Cisco Cisco C880 M4 Server インストールガイド
105
CA92344-0879-01
APP0306030
C.6.3 FBU (IOUL)
It
explains the procedure for installing FBU (flash backup unit) in IOU_1GbE.
It is necessary to arrange kit (FBU-TRAY) equipped with the flash backup unit besides FBU for the
installation.
(1) The direction of FBU to FBU HOLDER decides the direction of ① and ② as shown by
"Figure C.6.3-1"
because there are two kinds by the position installed in FBU-TRAY.
Figure C.6.3-1
(2) It matches it under the maintenance bracket on both sides of FBU HOLDER while inclining FBU
a little referring to "Figure C.6.3-2".
(3) FBU is inserted until being fixed to the position.
Figure C.6.3-2
(4) FBU that has installed FBU HOLDER referring to "Figure C.6.3-3" is installed in FBU-TRAY.
When two pieces are installed, it installs it in order of ①→②.