Cisco Cisco C880 M4 Server インストールガイド

ページ / 134
34 
CA92344-0879-01 
 
SET0601030 
6.1.3 Main unit status 
 
- Table 6.1.3 lists whether an SB addition can be added in each main unit status. 
Table 6.1.3 
Main unit status 
Work possible? 
- AC power to the main unit is off 
  (Cold maintenance (AC power off)) 
Yes 
- AC power to the main unit is on 
- System Powered Off 
  (Cold maintenance (standby)) 
Yes 
- AC power to the main unit is on 
- System Powered On   
  (Hot maintenance) 
No 
 
 
SET0602000 
6.2  Procedure for Adding an IOUs 
 
SET0602010 
6.2.1 Checking the delivered items 
 
(1) Check the delivered items by confirming the following. 
1. The types and quantities of delivered options match those written on the order sheet. 
2. The delivered items match those listed in the List of Accessories. 
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt. 
4. The specifications and version level of units delivered separately due to delivery considerations 
are available for the target functions. 
 
 
SET0602020 
6.2.2 Mounting the adding options 
 
Use the following steps to mount the added options. 
 
 
ANNT) 
If you are going to handle a power cable during power-on and power-off operations, be sure to   
confirm in advance the cable connection locations on the relevant equipment and on the customer   
distribution panels or power distribution boxes. 
 
ANNT)  If you start the work with the main unit powered off, turn on the AC power and mount the added 
options.. 
 
(1) Connect the FST. See Appendix B.2.1, "FST Setup and Connection 
"
(2) Login to the Web-UI. 
Table 6.2.2 lists the values to be set to log in to Web-UI. 
See Appendix B.3.1, "Logi
"