Cisco Cisco 12000 Series 4-Port OC-12c STM-4c ATM Line Card 情報ガイド
All contents are Copyright © 1992–2004 Cisco Systems, Inc. All rights reserved. Important Notices and Privacy Statement.
Page 1 of 4
PRODUCT BULLETIN NO. 2917
END-OF-SALE AND END-OF-LIFE ANNOUNCEMENT FOR
THE CISCO 12000 8-PORT OC-3/STM-1 ATM LINE CARD
THE CISCO 12000 8-PORT OC-3/STM-1 ATM LINE CARD
Cisco Systems® announces the end-of-sale and end-of-life dates for the Cisco® 12000 Series Eight-Port OC-3/STM-1 ATM Line Card.
The last day to order the affected product is May 28, 2006. Customers with active service contracts will continue to receive support from
the Cisco Technical Assistance Center (TAC) until May 28, 2011. Table 1 describes the end-of-life milestones, definitions, and dates for
the affected product. Table 2 lists the product part numbers affected by this announcement.
Customers are encouraged to migrate to the Cisco 12000 Series 4-Port OC-3/STM-1 ATM ISE Line Card which features the IP Services
Engine (ISE)—a powerful adaptive network processor (ANP) that combines the hardware performance of application-specific integrated
circuits (ASICs) with the flexibility of software to deliver multiple robust network-edge features while maintaining predictable line-rate
performance. Information about this product can be found at:
http://www.cisco.com/en/US/prod/collateral/routers/ps167/product_data_sheet0900aecd8042b41a.html
.
Table 3 provides relevant information for migrating to the replacement product.
Table 1.
End-of-Life Milestones and Dates for the Cisco 12000 Series Eight-Port OC-3/STM-1 ATM Line Card
Milestone
Definition
Date
End-of-life announcement
date
The date the document that announces the end of sale and end of life of a
product is distributed to the general public.
May 28, 2005
End-of-sale date
The last date to order the product through Cisco point-of-sale mechanisms. The
product is no longer for sale after this date.
May 28, 2006
Last shipment date
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
August 28, 2006
End of software
maintenance releases date
The last date that Cisco Engineering may release any final software
maintenance releases or bug fixes. After this date, Cisco Engineering will no
longer develop, repair, maintain, or test the product software.
May 28, 2009
End of routine failure
analysis date
The last-possible date a routine failure analysis may be performed to determine
the cause of product failure or defect.
May 28, 2007
End of new service
attachment date
For equipment and software that is not covered by a service-and-support
contract, this is the last date to order a new service-and-support contract or add
the equipment and/or software to an existing service-and-support contract.
May 28, 2007
End of service contract
renewal date
The last date to extend or renew a service contract for the product.
November 28, 2009
Last date of support
The last date to receive service and support for the product. After this date, all
support services for the product are unavailable, and the product becomes
obsolete.
May 28, 2011