Cisco Cisco Broadband Access Center for Cable 4.1 情報ガイド
Product End-of-Life Notice
Page 1 of 2
End-of-Sale and End-of-Life Announcement for the Cisco
Broadband Access Center 2.6.9T
Broadband Access Center 2.6.9T
EOL6243
Cisco
®
announces the end-of-sale and end-of life dates for the Cisco Broadband Access
Center 2.6.9T. The last day to order the affected product(s) is April 3, 2008. Customers
with active service contracts will continue to receive support from the Cisco Technical
Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the
end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the
product part numbers affected by this announcement. For customers with active and paid
service and support contracts, support will be available until the termination date of the
contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco Broadband Access Center 2.6.9T
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a
product is distributed to the general public.
product is distributed to the general public.
October 4, 2007
End-of-Sale Date
The last date to order the product through Cisco point-of-sale
mechanisms. The product is no longer for sale after this date.
mechanisms. The product is no longer for sale after this date.
April 3, 2008
Last Ship Date:
App. SW
App. SW
The last-possible ship date that can be requested of Cisco and/or its
contract manufacturers. Actual ship date is dependent on lead time.
contract manufacturers. Actual ship date is dependent on lead time.
July 2, 2008
End of SW Maintenance
Releases Date:
App. SW
Releases Date:
App. SW
The last date that Cisco Engineering may release any final software
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
April 3, 2009
End of New Service
Attachment Date:
App. SW
Attachment Date:
App. SW
For equipment and software that is not covered by a service-and-support
contract, this is the last date to order a new service-and-support contract
or add the equipment and/or software to an existing service-and-support
contract.
contract, this is the last date to order a new service-and-support contract
or add the equipment and/or software to an existing service-and-support
contract.
April 3, 2009
End of Service Contract
Renewal Date:
App. SW
Renewal Date:
App. SW
The last date to extend or renew a service contract for the product.
June 30, 2010
Last Date of Support:
App. SW
App. SW
The last date to receive service and support for the product. After this
date, all support services for the product are unavailable, and the product
becomes obsolete.
date, all support services for the product are unavailable, and the product
becomes obsolete.
April 3, 2011
HW = Hardware
OS SW = Operating System Software App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
BAC-2.6.9-SIP-10K
10K subs Data technology license (10K SIP, 10K Computer)
BAC-2.6.9-SIP-10K=
10K subs Data technology license (10K SIP, 10K Computer)
BACBASESIP2.6.9-K9
BAC software components (RDU software)
DPE-SOL-SIP-2.6.9
1 DPE license (distrib. processing/caching engine- Solaris)
DPE-SOL-SIP-2.6.9=
1 DPE license (distrib. processing/caching engine- Solaris)