Chapter 1    Installation Process Overview 
 
 
 
10 
78-4003052-01 Rev G 
How Long Does Each Phase Take? 
This section provides a table with a general description of the four installation 
phases and the approximate length of time required to complete each phase. The 
remaining chapters of this document provide more detail for each phase. 
 
The Four Phases 
The installation process involves 4 phases, ideally performed across 7 days. The 
actual amount of time needed to complete the entire process varies depending on the 
size of the site, the complexity of the system, and the kinds of applications being 
deployed. 
The following table provides a general description of the four phases and the 
approximate length of time needed to complete each phase. 
Phase  Description 
Timeframe 
Time to Complete 
One 
Complete pre-upgrade 
tasks and install the 
software on the DNCS 
1 to 3 days before the 
start of Phase Two 
(during business hours) 
3 hours 
Two 
Test load the new 
software 
3 business days after 
starting Phase One 
(during business hours) 
3 hours 
Three  Download the software  24 hours after 
completing Phase Two 
(during a maintenance 
window) 
See How Long 
Does it Take? (on 
page 64) 
Four 
Clean up 
Wait either: 
 
1 week if you used 
a normal (deferred) 
download 
 
24 hours if you 
used an immediate 
download 
3 hours