Cisco Model D9477 MQAM Modulator インストールガイド
Installation Process Summary
78-717866-01 Rev D
13
Stage
Process
See Procedure
6
Do the following:
Power up the MQAM.
Record the MQAM MAC address
from the front-panel display.
Turn off the MQAM.
Record the MAC Address (on page
7
Connect other network devices to the
MQAM, except the RF OUT ports.
Connect the DVB ASI Input Ports
(on page 22)
Connect the CA SYNC Port (on page
Connect the 10/100BaseT Ethernet
Port (on page 26)
8
Define the MPEG sources and
provision the MQAM using DNCS
Element Provisioning according to
your network wiring diagram.
Provision the MQAM (on page 29)
Digital Network Control System Online
Help for your system release
9
Power up the MQAM
Connect Power Sources (on page 16)
10
Ensure that the MQAM boots correctly
and check for alarms from the front
panel.
Understand the Boot Process (on
page 42)
Troubleshooting Alarm Messages (on
page 72)
Troubleshooting Boot Screen Error
Messages (on page 79)
11
If sessions have been defined for the
MQAM path, verify the correct session
count by pressing the OPTIONS
button.
Monitor Setup Options (on page 54)
12
If encrypted, check the program count.
Viewing the Program Count (on page
13
Connect the RF output ports.
Connect the RF OUT Ports (on page
14
Set the power output level for each RF
Module in accordance with your
network wiring diagram and spectrum
analyzer measurements.
Adjust the RF Output Level of a
Selected RF Module (on page 51)
15
Verify video and audio from a local
DHCT.
See the post-upgrade procedures for
your current System Release contained in
the upgrade installation instructions.