Cisco Cisco 1 GHz GainMaker Amplifier インストールガイド

ページ / 124
 
Chapter 2    Installation and Configuration 
 
 
 
38 
 
Removing and Installing AC Shunt Power Directors 
The amplifiers draw AC power from the coaxial cable. This AC power comes from an 
external AC power supply. 
  
WARNING: 
When AC is applied from RF ports to units downstream, the downstream 
equipment shall also be located in a restricted access location (access restricted 
to service personnel).
 
Power can come from the input or output ports, and each amplifier can pass or block 
AC power flow on any port without affecting RF continuity. However, at least one 
port must pass AC power to bring power into the amplifier. 
To set the power direction, install AC shunt power directors for the ports through 
which you wish to pass AC. 
Note: A red AC shunt power director is included with the unit. The red shunt is used 
to activate the port that supplies power. The red shunt should be removed before 
installing or removing the amplifier module from the housing. 
 
CAUTION: 
RF connectors and housing seizure assemblies can be damaged if AC shunt 
power directors are not removed from the amplifier before installing or 
removing the amplifier module from the housing.
 
 
To Remove and Install AC Shunt Power Directors 
Complete the following steps to remove and install AC shunt power directors. 
1  Open the housing. Refer to To Open the Amplifier Housing (on page 13). 
2  To remove a power director, pull it straight out from the amplifier module. 
 
3  To install a power director, refer to the systems design print to determine AC 
power routing and install the AC shunt power directors in the required locations. 
4  Close the housingRefer to To Close the Amplifier Housing (on page 39).