HP sas dl360 ユーザーズマニュアル

ページ / 136
 
Server setup 
35 
 
 
 
The leveling jacks are extended to the floor. 
 
The full weight of the rack rests on the leveling jacks. 
 
The stabilizing feet are attached to the rack if it is a single-rack 
installation. 
 
 
The racks are coupled together in multiple-rack installations.  
 
Only one component is extended at a time. A rack may become 
unstable if more than one component is extended for any 
reason.
 
 
  WARNING:  To reduce the risk of personal injury or 
equipment damage when unloading a rack: 
 
At least two people are needed to safely unload the rack from 
the pallet. An empty 42U rack can weigh as much as 115 kg 
(253 lb), can stand more than 2.1 m (7 ft) tall, and may become 
unstable when being moved on its casters.
 
 
Never stand in front of the rack when it is rolling down the ramp 
from the pallet. Always handle the rack from both sides.
 
 
Contents of the server shipping carton 
Unpack the server shipping carton and locate the materials and documentation 
necessary for installing the server. All the rack mounting hardware necessary for 
installing the server into the rack is included with the rack or the server.  
The contents of the server shipping carton include: 
•  Server 
•  Power cord 
•  Printed setup documentation, Documentation CD, and software products 
•  Rack mounting hardware kit and documentation 
In addition to these supplied items, you may need: 
•  T-15 Torx screwdriver