Juniper CBL-M40-PWR-AU ユーザーズマニュアル

ページ / 268
Install the Router without Using a Mechanical Lift
M40 Internet Router Hardware Guide
104
Remove the Cable Management System
The cable management system is located at the top front of the chassis, above the card cage 
(see Figure 1). It weighs only about 1 lb (0.5 kg), but you might want to remove it so that it 
does not interfere with your hand hold as you lift the chassis.
To remove the cable management system, follow this procedure:
1.
Attach an ESD strap to your bare wrist and connect the strap to one of the ESD points on 
the chassis.
2.
Unscrew the two captive screws on top of the cable management system cover and 
remove the cover (see Figure 30).
3.
Unscrew the four screws on the faceplate of the cable management system (see 
Figure 31).
4.
Remove the unit from the chassis.
Figure 30:  Remove the Cable Management System Cover
Figure 31:  Remove the Cable Management System
1077
Captive screws
1050