Linear AE-100 ユーザーズマニュアル

ページ / 36
10
Multiple Unit Telephone Wiring
Up to four AE-100 units may be connected to the same dedicated 
telephone line to form a simple network. Connecting multiple units allows 
transferring programming data (either the directory entries only or the 
entire memory’s contents) from the “master” unit to the other sub-units.
 NOTE: For a multiple-unit installation to function properly, be sure 
to set programming Steps #07 & #71
Multiple Units Home Run Wired
1.  Mount and install the master and sub-units.
2.  Choose one unit to be the “master” unit and act as the “hub”. 
Usually this would be a centrally located or “main” unit.
3.  Route 2-conductor telephone cable from the master 
unit to each of the sub-units (see fi gure).
4.  Connect each sub-unit’s 2-conductor telephone cable 
its TELEPHONE terminals (polarity not important).
5.  At the master unit, connect all the sub-unit 
2-conductor telephone cables to the master unit’s 
TELEPHONE terminals (polarity not important).
Multiple Units Daisy-chain Wired
1.  Mount and install the master and sub-units.
2.  Choose one unit to be the “master” unit. Usually this 
would be a centrally located or “main” unit.
3.  Route 2-conductor telephone cable from the 
master unit to the closest sub-unit.
4.  Route 2-conductor telephone cable from the 
sub-unit in Step 3 to the next sub-unit.
5.  Repeat for all sub-units (see fi gure).
6.  Connect the 2-conductor telephone cables to the TELEPHONE 
terminals in each unit (polarity not important).
TELEPHONE
TERMINALS
AE-100
MASTER
UNIT "1"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "3"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "4"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "2"
MULTIPLE UNIT HOME RUN WIRING
TELEPHONE
TERMINALS
AE-100
MASTER
UNIT "1"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "3"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "4"
TELEPHONE
TERMINALS
AE-100
SUB-UNIT "2"
MULTIPLE UNIT DAISY-CHAIN WIRING