Vulcan Materials c24ga10 ユーザーズマニュアル

ページ / 40
F35425 (February 2006)
Page 15 of 40
C24GA SERIES CONVECTION STEAMERS - SERVICE PROCEDURES AND ADJUSTMENTS
16. Turn off the machine.
17. Re-install pilot, reconnect wire # 35.
18. Turn on the machine, let generator fill
19. Observe proper functioning of gas burner.
Operating Pressure Switch
1.
Remove the cabinet base front panel as outlined
under COVERS AND PANELS. Pressure switch
is located behind control box.
2.
Turn the power on and let the generator come up
to pressure.
3.
After the ready light comes on, turn one of the
cooking compartment timers on to exhaust
steam from the generator.
4.
Observe generator pressure gauge reading for
several cycles and verify that the burner is
cycling off at 3.5 to 4 psi.