Boston Scientific Neuromodulation Corporation PSC5210W ユーザーズマニュアル

ページ / 68
22
Physician Implant Manual
2. Cut the lead extension at the connector. 
3. Pull the lead extension through the tunnel and away from body at 
the externalized site.
4. Loosen the connector setscrew using the torque wrench provided. 
Disconnect and discard the connector.
Note: Connect a new lead extension, if necessary, to reach the 
selected IPG site.