Sensors & Software Inc. NG250 ユーザーズマニュアル

ページ / 155
Appendix C - GPR Emissions, Interference and Regulations
Noggin
C-4
ferent locations upon coordination of change of ownership or location to the FCC and coordination with
existing authorized operations.
    (e) The FCC/NTIA coordination report shall identify those geographical areas within which the operation
of an imaging system requires additional coordination or within which the operation of an imaging system
is prohibited. If additional coordination is required for operation within specific geographical areas, a local
coordination contact will be provided. Except for operation within these designated areas, once the infor-
mation requested on the UWB imaging system is submitted to the FCC no additional coordination with the
FCC is required provided the reported areas of operation do not change. If the area of operation changes,
updated information shall be submitted to the FCC following the procedure in paragraph (b) of this section.
    (f) The coordination of routine UWB operations shall not take longer than 15 business days from the
receipt of the coordination request by NTIA. Special temporary operations may be handled with an expe-
dited turn-around time when circumstances warrant. The operation of UWB systems in emergency situa-
tions involving the safety of life or property may occur without coordination provided a notification
procedure, similar to that contained in Sec.  2.405(a) through (e) of this chapter, is followed by the UWB
equipment user.[67 FR 34856, May 16, 2002, as amended at 68 FR 19751, Apr. 22, 2003]
    Effective Date Note: At 68 FR 19751, Apr. 22, 2003, Sec.  15.525 was amended by revising[[Page
925]]paragraphs (b) and (e). This amendment contains information collection and recordkeeping require-
ments and will not become effective until approval has been given by the Office of Management and Bud-
get.