Abbreviated (All–inclusive) Acceptance Tests
68P64115A18–1
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
4-14
Table 4-7: All RX ATP Test Procedure
Step
Action
11
NOTE
When testing diversity RX paths on companion frames, be sure to follow the RX test cable connection
information in Table 4-1 or Table 4-2, as applicable, during this step.
Follow cable connection directions as they are displayed, and click the Continue button to begin
testing.
– When the ATP process is completed, results will be displayed in the status report window.
12
Click the Save Results or Dismiss button.
NOTE
If Dismiss is used, the test results will not be saved in the test report file.
 