Charles Machine Works Inc The 8500TKR ユーザーズマニュアル

ページ / 71
System Operation - 46
8500 Tracking System Operator’s Manual
Drill-Thru Mode
CMW
  
Beacon is approaching tracker pitched up 7%. Beacon is 28” (2’ 4”) deep and the projected depth at 
tracker is 22” (1’ 10”). The horizontal distance to the tracker is 48” (4’). The beacon must be steered to 
the left to pass under the tracker as indicated by the arrow in the center of the Beacon View. The arrow 
will get longer as beacon gets farther off target and shorter as it gets closer to the target path.
Beacon is past tracker pitched up 1.6%. Beacon is 22” (1’ 10”) deep and the horizontal distance from 
the tracker is 15” (1’ 3”).
Drill-Thru View
Beacon View
Drill-Thru View
Beacon View