Intercontinental Technologies Ltd F22-24E0032 ユーザーズマニュアル
Intercontinental Technologies, Ltd.
Chapter 12
Page 41 of 87
12.2.4 Mainline Indicator Lamp PCB
This module indicates, by means of several bright red LEDs, when the mainline relay is activated
and the unit is ready to operate.
12.2.5 Run/Test Switch
This switch, part of the Relay PCB, interrupts the flow of power to the operating coils of the relays,
thus rendering them inoperative. The LED PCB is unaffected by this switch, and can be used to test
the equipment without movement of the crane. The switch functions in the same manner for both
the handheld and joystick models (see Figures 11 and 12).
This module indicates, by means of several bright red LEDs, when the mainline relay is activated
and the unit is ready to operate.
12.2.5 Run/Test Switch
This switch, part of the Relay PCB, interrupts the flow of power to the operating coils of the relays,
thus rendering them inoperative. The LED PCB is unaffected by this switch, and can be used to test
the equipment without movement of the crane. The switch functions in the same manner for both
the handheld and joystick models (see Figures 11 and 12).
Run/Test Switch
Figure 11: Location of Run/Test Switch in Receiver for Handhelds