Hughes Network Systems 24HX-001 ユーザーズマニュアル
1027145 – 0001 Revision E
Index-4
M
MAC address, 7–2
Magnetic declination, 4–6
Main Menu (CCM LCD), 6–35
Maintenance, 10–1
Maps
local, requirements, 2–4, 4–5
magnetic declination, 4–6
plotting HT alignment directions, 4–6
true north, 4–6
magnetic declination, 4–6
plotting HT alignment directions, 4–6
true north, 4–6
Mast, diameter, 4–5
Mast mount, 3–2
location, 3–3
standard type, 3–6
standard type, 3–6
assembly instructions, 3–6
types, 3–5
using existing structures, 3–13
using existing structures, 3–13
Materials
handling, 3–4
required for installation, 2–6
required for installation, 2–6
Menu map for CCM LCD, 6–36
Moisture contamination, 8–2
Mounts. See Mast mount and Antenna mount
Moving SSIs, 10–2
Multiple IFL cables, 5–10
N
N connectors
attaching to IFL cable, C–6
location (IFL cable), 5–3
location (IFL cable), 5–3
National Electric Code (NEC), B–2
O
OC3c–ATM SSI, 6–29
ODU, 4–1
connecting the IFL cable, 5–15
grounding, 4–25
illustration, 4–3
location, 2–1
replacing, 10–3
standards compliance, B–2
status, 7–9
transporting to the roof, 4–5
grounding, 4–25
illustration, 4–3
location, 2–1
replacing, 10–3
standards compliance, B–2
status, 7–9
transporting to the roof, 4–5
ODU location, 3–3
Operational state, 7–6
possible states, 7–6
Outdoor unit. See ODU
P
Penetrating the roof, 5–5
Penetration sleeve, 5–6
Personnel
number of installers, vii
qualifications, installers, vii
qualifications, installers, vii
Power input requirement
ac power supply, 6–13
dc power supply, 6–16
dc power supply, 6–16
Power supply (IDU), 6–8, 6–11
ac, 6–13
connecting power, 6–15
grounding, 6–14
power input requirement, 6–13
grounding, 6–14
power input requirement, 6–13
dc, 6–16
connecting power, 6–18
grounding, 6–16, 6–17
power input requirement, 6–16
powering off, 6–22
grounding, 6–16, 6–17
power input requirement, 6–16
powering off, 6–22
dual ac or dc, 6–11
See also Power supply (IDU), dc
grounding, 6–12
grounding, 6–12
Power–on test
CCM, 6–37
IDU chassis, 6–25
IDU chassis, 6–25
Prerequisites
commissioning, 2–7, 7–2
installation, 2–1
installation, 2–1
Publications, related, vii
Q
Qualifications for installers, vii
R
Rack
See also hub rack
mounting, 6–8
mounting, 6–8
options, 6–8
safety guidelines, 6–8
safety guidelines, 6–8
Redundancy bus cable, 6–34, 7–2
Related publications, vii
Remote terminal (RT) installation, vii
Repairs, 9–6