Tait International Limited TBCH1A ユーザーズマニュアル

ページ / 138
 
76
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Functional Tests
The following table provides an overview of the tests available using the 
web interface. Refer to the Help for full details of these tests.
Test
Notes
Menu
receiver operation
requires a suitable RF source
Diagnose > RF Interface > Receiver
transmitter operation
requires connection to the 
network
Diagnose > RF Interface > Transmitter
synchronized transmit
checks the simulcast operation of 
a channel group or the 
transmitters in it
Diagnose > RF Interface > Synchronized 
Transmit
ping
checks the IP connection to 
another device with an IP address
Diagnose > Connection > Network
NTP query
checks if the NTP-based time 
synchronization is working
PMU mains failure
requires a DC backup supply
Diagnose > Subsystems > PMU Control 
Tests
fan operation
checks the operation of each fan 
individually
Diagnose > Subsystems > Fan Tests