Tait International Limited TBCH1A ユーザーズマニュアル
94
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.6.7
Connecting a 1PPS Source
A 1PPS signal is required for simulcast base stations. Use a 50
Ω coaxial
cable (RG58 or RG223) to connect the source to the base station’s 1PPS
input. You can daisy-chain up to eight base stations using F-junctions. We
recommend that the cable length between the first and last load is kept to a
minimum. This will reduce any propagation variation between base
stations. The maximum overall cable length is 30m. Terminate the last
connection with a 50
input. You can daisy-chain up to eight base stations using F-junctions. We
recommend that the cable length between the first and last load is kept to a
minimum. This will reduce any propagation variation between base
stations. The maximum overall cable length is 30m. Terminate the last
connection with a 50
Ω resistor, otherwise reflections of the 1PPS pulse
may occur.
A 1PPS signal will be required for all base stations operating in a P25
Phase 2 system. If you intend to upgrade TB9400 base stations to P25
Phase 2 operation at a later date, we suggest that you provide the 1PPS
source, or at least the necessary cables, at the time of installation.
Phase 2 system. If you intend to upgrade TB9400 base stations to P25
Phase 2 operation at a later date, we suggest that you provide the 1PPS
source, or at least the necessary cables, at the time of installation.
5.6.8
Ethernet Connection
The RJ-45 socket on the reciter’s rear panel provides the 10BASE-T or
100BASE-T Ethernet connection to the other devices in the network. Use
Cat-5 cable to connect this socket to the Tait P25 Network via a router or
switch.
100BASE-T Ethernet connection to the other devices in the network. Use
Cat-5 cable to connect this socket to the Tait P25 Network via a router or
switch.
If necessary, refer to
for a list of
Ethernet connection pin allocations.
Figure 5.13 Daisy-chaining a 1PPS input
The longest length of cable must be between
the source and the first base station
use short lengths of cable
between each base station
maximum of eight base station
loads on one 1PPS output
50
Ω termination