Mingbo Education Technology Co. Ltd. ZWG81000B ユーザーズマニュアル
U-Class Z-wave IoT Gateway (ZWG81000B) User Manual
8
6. Instructions
6.1. POWER ON/OFF
Power ON
Purpose:Power ON gateway, boot up system. Steps:
Step-1:Plug-in power adapter and Ethernet cable.
Purpose:Power ON gateway, boot up system. Steps:
Step-1:Plug-in power adapter and Ethernet cable.
Power OFF
Purpose:Power OFF gateway, shut down system.
Purpose:Power OFF gateway, shut down system.
6.2. Web Console
Purpose:Gateway Configuration Steps:
Step-1:Open a IE or Chrome browser on a PC which connected to the same LAN network with
gateway.
Step-1:Open a IE or Chrome browser on a PC which connected to the same LAN network with
gateway.
Step-2:Type-in the IP address, ex:”192.168.0.100”.
(
Default IP
:
192.168.0.100
)
Step-4:Type-in the password.
(
Default Password
:
888888
)
Step-5:Click“Login”