Arris WA840G ユーザーズマニュアル

ページ / 70
INSTALLATION 
SECTION 2
 
 SECTION 
2, 
INSTALLATION 
2-5
 
Be sure you print the template at 100% scale and that Fit to page is 
not checked in the Print dialog box. 
3  Click OK to print the template. 
4  Measure the printed template with a ruler to ensure that it is the 
correct size. 
5  Use a center punch to mark the center of the holes on the wall. 
6  On the wall, locate the marks for the mounting holes you just 
made. 
WARNING! 
 
Before drilling holes, check the structure for potential 
damage to water, gas, or electric lines. 
 
7  Drill the holes to a depth of at least 3.8 cm (1½ inches). 
8  If necessary, seat an anchor in each hole. Use M5 x 38 mm 
(#10-16 x 1½ inch) screws with a flat underside and maximum 
screw head diameter of 10.5 mm to mount the unit. 
9  Using a screwdriver, turn each screw until part of it protrudes 
from the wall, as shown: 
There must be 4.0 mm (.16 inches) between the wall and the 
underside of the screw head. 
The maximum distance from the wall to the top of the screw 
head is 7.6 mm (.3 in). 
4.0 mm
10.5 mm (.4 inches)
maximum
7.6 mm (.3 inches)
maximum
 
10  Remove the front two plastic feet, nearest to the LED panel, from 
the bottom of the unit to uncover the keyholes. 
11  Place the unit so the keyholes are above the mounting screws. 
12  Slide the AP down until it stops against the top of the keyhole 
opening. 
13  Follow the installation procedures for connecting and configuring 
the unit.