Counter 10x
Test with 10 repetitions
5.1.2.1 L
OAD
To begin a timing session of the desired type, select the line using the <up> and <down> arrow keys and press
<F1> Load (or the <OK> key).
<F1> Load (or the <OK> key).
Now, thanks to these preconfigured tests, let's see an example for every test type:
5.1.2.2 S
PRINT
S
TART
-S
TOP
:
TIMING OF A
BASIC
I
N
-L
INE
T
EST
The Test Base is this type of test; please refer to chap. 5.1.1 for further information.
5.1.2.3 G
O
&
B
ACK
:
TIMING OF A
BASIC
G
O
&
B
ACK
T
EST
The Go & Back test is also basically the same as an In-Line test; please refer to the latter for further
information.
information.
5.1.2.4 S
HUTTLE
5
X
+
30":
TIMING OF A
BASIC
S
HUTTLE
T
EST
During the first sprint, the timer shows information as for an In-Line test; after crossing the stop photocell, a
countdown starts for the amount of time set as recovery time:
countdown starts for the amount of time set as recovery time:
When the athlete starts again for the second sprint, the advance or delay (signaled by an intermittent beep)
is calculated with respect to the recovery time; these times are highlighted on the data table with the letter
R (Recovery). In the example below the athlete has begun the second sprint with an advance of -1.4, and the
third with a delay of +1.6.
is calculated with respect to the recovery time; these times are highlighted on the data table with the letter
R (Recovery). In the example below the athlete has begun the second sprint with an advance of -1.4, and the
third with a delay of +1.6.