IT-GROUP MFG LTD T1489 ユーザーズマニュアル
Product design Verification and validation:
Before Mass Production following items must be verified:
1. Functionality
2. CE/FCC compliance
3. Protection against dust and water: IP54
4. Reliability test: climatic resistance,(-10℃ for 1 hours, 50℃ for 1 hours, with operation)
5. Packing drop test and transportation simulation test.
Traceability design:
The Product can be trace back to the Production Lot by lot number of format: YYWW (Year
/Week)