Aten PN7320 クイック設定ガイド

ページ / 2
Single Stage Installation
In a Single Stage installation, there are no additional PN7212 / PN7320 Stations daisy chained down 
from the first unit. To set up a single stage installation, refer to the installation diagram (the numbers in 
the diagram correspond to the numbered steps), and do the following
1. Use a grounding wire to ground the PN7212 / PN7320 by connecting one end of the wire to its 
grounding terminal, and the other end of the wire to a suitable grounded object.
Note: Do not omit this step. Proper grounding helps to prevent damage to the unit from surges or 
static electricity.
2. For each device you want to connect, use its power cable to connect from the device's AC socket to 
any available outlet on the PN7212 / PN7320. 
3. Plug the cable that connects the PN7212 / PN7320 to the LAN into the PN7212 / PN7320's LAN port.
4. (Optional) If you wish to connect a modem, use Cat 5e cable to connect the PN7212 / PN7320’s 
Modem port to the SA0142 (DCE) adapter supplied with your package. Connect the adapter’s serial 
connector to the modem’s DB-9 port.
5. (Optional) If you wish to use a console terminal connection, use Cat 5e cable to connect the PN7212 / 
PN7320’s PON IN/Console port to the SA0151(DTE) adapter supplied with your package. Connect 
the adapter’s serial connector to the COM port of the computer you will use for the console terminal.
6. (Optional) If you wish to connect a temperature or humidity sensor, its RJ-11 connector plugs in here.
7. (Optional) If you wish to connect a temperature or humidity sensor, its RJ-11 connector plugs in here.
8. (Optional) If you wish to connect a digital output device, wire it to this two-pin terminal.
9. Connect the PN7212 / PN7320's power cord to an AC power source.
Note: 1. We strongly advise that you do not plug the PN7212 / PN7320 into a multi socket extension 
cord, since it may not receive enough amperage to operate correctly. 
 
2. Circuit breakers are not provided on the PN7212. Therefore, we strongly recommend that 
you do no plug the unit directly into any unprotected power source (such as a wall outlet).
Once you have finished these installation steps, you can turn on the PN7212 /PN7320 and the connected 
devices.
Note: We strongly recommend using cable ties and cable bars to safely and securely route the cables 
attached to the back of the unit.
2. L bracket, mounting style 1
3. L bracket, mounting style 2
4. Z bracket, mounting style 1, 
front and rear view.
5. Z bracket, mounting style 2
Package Contents
1
3
Hardware Review (Port and LED Panel)
The PN7212/PN7320 package consists of:
1 PN7212 or PN7320 Power Distribution Unit
4 Serial Adapters:
1 SA0142 (RJ45F to DB9M)
1 SA0149 (RJ45F to DB9F)
1 SA0150 (RJ45F to DB9M)
1 SA0151 (RJ45F to DB9F)
2 Rack Mount Kits
Hardware Installation
5-2
Rack Mounting
The PN7212 / PN7320 can be installed in a 0U configuration on the side of a rack.  To rack mount 
the device, use the rack mounting brackets that came with your device.
1. The brackets can be mounted either on the back panel, or the top and bottom of the device.   
5-1
Hardware Installation
1. Station / Outlet Selection
2. Readout Section 
3. Status LEDs and Reset Switch
4. LAN Port
5. PON Out Port
6. RS-232/RS-485 Switch
7. Sensor 1
8. Sensor 2
9. Digital Output
10. Modem Port
11. PON In / Console Port
• Browsers accessing the PN7212 / PN7320 must support SSL 128 bit encryption.
• For cold booting of attached computers, the computer's BIOS must support Wake on LAN or 
System after AC Back.
• For Safe Shutdown:
• The computer must be running Windows (Windows 2000 or higher), or Linux.
• The Safe Shutdown program (available by download from our website), must be installed and 
running on the computer
PN7212/PN7320 Power Distribution Unit (PDU)
Quick Start Guide
© Copyright 2012 ATEN
®
 International Co., Ltd.   www.aten.com
Altusen and the Altusen logo are trademarks of ATEN International Co., Ltd. 
All rights reserved. All other trademarks are the property of their respective owners.
This product is RoHS compliant    
PAPE-1215-501G           Printing Date: 02/2012
Requirements
4
1 User Instructions
1 Software CD
Note: The Front View diagram depicts a PN7320. The PN7212 is basically the same, except there are 
only 12 AC power sockets (6 on each side of the Port and LED panel), and all the sockets are 
NEMA 5-15R or IEC320 C13. There are no NEMA 5-20R or IEC320 C19 sockets
1. Power Sockets
2. Port and LED Panel
3. Power Sockets
4. Circuit Breakers (PN7320 only)
5. Grounding Terminal
6. Power Cord 
Hardware Review (Front View)
2
3
6
9
7
8
5
4
2
1
Modem
1
2
3
4
5
6
7
8
9
10
11
SENSO
R
 
2
SENSO
R
 
1
3
2
1
4
5
6
1
3
PN7320 - NEMA
PN7320 - IEC
All information, documentation, and specifications contained in this media are subject to change without prior notification by the manufacturer. 
Please visit our website to find the most up to date version. 
Online Registration
International:
• http://support.aten.com
North America:
• http://www.aten-usa.com/product_registration  
 
Technical Phone Support
International:
• 886-2-8692-6959
China:
• 86-10-5255-0110
Japan:
• 81-3-5615-5811
Korea:
• 82-2-467-6789
North America:
• 1-888-999-ATEN   Ext: 4988  
United Kingdom:
• 44-8-4481-58923