5.  Glue the intake vent terminal to the section of the pipe.
6.  Slide the wall plate over the pipe to stop against intake vent terminal.
7.  Place a bead of caulking (not supplied) around the gap between the pipe 
and the wall. Place some of the caulking on the back of the plate to hold 
it against the wall after installation.
8.  If  the  vent  pipe  is  installed  up  to  the  wall,  with  a  coupling  on  the 
end  against  the  wall  opening,  the  pipe  with  the  vent  terminal  can  be  
prepared  for  gluing  before  inserting  through  the  wall.  Slide  the  pipe 
through the wall and insert into coupling on the other side of the wall, 
making sure that the vent terminal ends up pointed in the correct position 
(See Figure 9)
.
FIGURE 9.
FIGURE 10.
VERTICAL  VENT  TERMINAL INSTALLATION
IMPORTANT
WHEN  TERMINATING  THROUGH  A  ROOF,  THE  FOLLOWING 
SPECIFICATIONS  PERTAINING TO TERMINAL  LOCATION  MUST  BE 
FOLLOWED.
1.  Proper support must be provided for all pipe protruding through the roof.
2.  The vertical roof terminations should be sealed with a plumbing roof boot 
or equivalent flashing.
3.  The  intake  vent  termination  and  the  exhaust  vent  termination  must 
penetrate the same side of roof.
4.  The center line of the intake vent termination and the center line of the 
exhaust vent termination must be no closer than 24" (61cm).
5.  The intake vent terminal and the exhaust vent terminal must be oriented 
facing downward and the same direction.
The specifications are displayed in Figure 10 & 11.
NOTE:  Exhaust vent terminal is installed using the same procedure.
INSTALLATION SEQUENCE
NOTE:  BEFORE BEGINNING INSTALLATION OF ANY VENT PIPE, READ 
“VENT PIPE PREPARATION” SECTION ON PAGE 12.
1.  After the points of termination have been determined, use the cover plates 
as templates to mark the holes for the vent pipes to be inserted through 
the roof.
2.  Drill  a  pilot  hole  approximately  1/4"  (6  mm)  outside  of  the  marked 
circle. This pilot hole is used as a starting point for a saws-all or sabre 
saw  blade.  Cut  around  the  marked  circle  staying  approximately  one 
quarter inch outside the line. (This will allow the vent pipe to easily slide 
through  the  opening). The  resulting  gap  will  be  covered  by  the  roof  
boot/flashing.
3.  Suspend the pipe through the center of the hole using proper support.
4.  Slide roof boot or equivalent flashing over pipe and secure roof boot 
equivalent flashing to roof.
5.  Seal around flashing.
6.  Terminate  intake  terminal  and  exhaust  vent  terminal  facing  down  as 
shown in Figure 11.
FIGURE 11.