Reliance Water Heaters RUF 100 199 SERIES 101 ユーザーズマニュアル

ページ / 36
3
  
DANGER
THIS  WATER  HEATER  IS  EQUIPPED  WITH  AN  ADJUSTABLE 
THERMOSTAT  TO  CONTROL  WATER  TEMPERATURE.  HOT  WATER 
TEMPERATURES  REQUIRED  FOR AUTOMATIC  DISHWASHER AND 
LAUNDRY USE CAN CAUSE SCALD BURNS RESULTING IN SERIOUS 
PERSONAL INJURY AND/OR DEATH. THE TEMPERATURE AT WHICH 
INJURY OCCURS VARIES WITH THE PERSON’S AGE AND THE TIME 
OF THE EXPOSURE. THE SLOWER RESPONSE TIME OF CHILDREN, 
AGED OR DISABLED PERSONS INCREASES THE HAZARDS TO THEM. 
NEVER ALLOW SMALL CHILDREN TO USE A HOT WATER TAP, OR TO 
DRAW THEIR OWN BATH WATER. NEVER LEAVE A CHILD OR DISABLED 
PERSON UNATTENDED IN A BATHTUB OR SHOWER. 
THE WATER HEATER SHOULD BE LOCATED IN AN AREA WHERE THE 
GENERAL PUBLIC DOES NOT HAVE ACCESS TO SET TEMPERATURES.
 
The water temperature is controlled using the Temperature Control Button 
on the Display at the front of the unit (See Figure 1). This control utilizes 
two  temperature  probes  to  determine  the  tank  temperature. The  primary 
temperature probe is located at the top of the tank and the other is near 
the water inlet.
The  temperature  may  be  adjusted  from  90°F/32°C  to  180°F/82°C. The 
thermostat was adjusted to 120°F/49°C before the heater was shipped from 
the factory. It is recommended that lower water temperature be used to avoid 
the risk of scalding. It is further recommended, in all cases, that the water 
FEATURES
IMPORTANT
IT IS REQUIRED THAT A QUALIFIED SERVICE TECHNICIAN PERFORM 
THE INITIAL FIRING OF THE HEATER.  AT THIS TIME THE USER SHOULD 
NOT HESITATE TO ASK THE TECHNICIAN ANY QUESTIONS WHICH HE 
MAY HAVE IN REGARD TO THE OPERATION AND MAINTENANCE OF 
THE UNIT.
A CHECKLIST AND SERVICE INFORMATION section are included at the rear 
of this manual.  By using this checklist the user may be able to make minor 
operational adjustments and save himself unnecessary service calls.  However, 
the user should not attempt repairs which are not listed in this section.
WATER TEMPERATURE CONTROL
TABLE OF CONTENTS
ROUGH-IN DIMENSIONS .................................................................  2
FOREWORD .....................................................................................  2
FEATURES ........................................................................................  3,4
  Water Temperature Control ...........................................................  3
  High Limit Switch (E.C.O.) ............................................................  4
  Dishwashing Machine Requirement ..............................................  4
  Circulating Pump ...........................................................................  4
INSTALLATION INSTRUCTIONS .....................................................  4-11
  Required Ability .............................................................................  4
  Insulation Blankets ........................................................................  4
  Locating The Heater ......................................................................  5
  Clearances ....................................................................................  5
  Hard Water ....................................................................................  6
  Air Requirements ..........................................................................  6
  Mechanical Exhausting of Room Air .............................................  6
  Unconfined Space .........................................................................  6
  Confined Space .............................................................................  6
  Chemical Vapor Corrosion ............................................................  6
  Venting ..........................................................................................  6
  Vent Pipe Termination ...................................................................  6-10
  Installation Requirements for the
  Commonwealth of Massachusetts ............................................... 
7
  Direct Venting ................................................................................  8
  Direct Vent Terminal Installation (Sidewall) ...................................  9
  Installation Sequence ....................................................................  9
  Vertical Vent Terminal Installation .................................................  10
  Installation Sequence ....................................................................  10
  Installation of Vent System ............................................................  11
  Vent Pipe Preparation ...................................................................  11
CONTROL AND SWITCHES .............................................................  12
  Blower Prover Switch ....................................................................  12
  Blocked Outlet Prover Switch ........................................................  12
  Blocked Inlet Prover Switch ..........................................................  12
  Low Gas Pressure Switch .............................................................  12
  On/Off Switch ................................................................................  12
  Hot Surface Igniter ........................................................................  12
GAS PIPING ......................................................................................  12
  Connection of Gas Pipe ................................................................  13
  Purging ..........................................................................................  14
  Gas Meter Size - City Gases Only ................................................  14
  Gas Pressure Regulation ..............................................................  14
  Gas Valves ....................................................................................  14
SYSTEM CONNECTIONS ................................................................  14
  Thermometers ...............................................................................  14
  Relief Valve ...................................................................................  14
  Water Line Connections ...............................................................  14
  Heater Wiring ...............................................................................  15
USING THE ELECTRONIC CONTROLLER ....................................  16
  Overview ......................................................................................  17
  Operating States ..........................................................................  17
  Adjusting the Operating Set Point ................................................  17
  Changing the Display Units ..........................................................  18
  Fault and Alert Conditions ............................................................  18
  Access to the Current Fault or Alert .............................................  18
  Viewing the Fault History .............................................................  19
PRIOR TO START-UP ......................................................................  19
  Required Ability ............................................................................  19
OPERATING INSTRUCTIONS .........................................................  20
  Adjustment Procedure (Initial Start-Up) .......................................  20
  Cathodic Protection ......................................................................  21
  Precautions ..................................................................................  21
GENERAL INFORMATION ...............................................................  21
  Power Burner ...............................................................................  21 
  High Limit .....................................................................................  21
  High Altitude Installations .............................................................  21
MAINTENANCE ...............................................................................  21
  General ........................................................................................  21
  Maintenance Schedule  ................................................................  21
  Flushing ........................................................................................  23
  Draining ........................................................................................  23
  Sediment Removal .......................................................................  23
  Lime Scale Removal ....................................................................  23
  Anode Inspection and Replacement ............................................  23
  Drain Valve and Access Panels ...................................................  24
  Relief Valve ..................................................................................  24
  Circulating Pump ..........................................................................  24
  Vent System .................................................................................  24
INSTALLATION DIAGRAMS ............................................................  25-29
  Manifold Kits .................................................................................  30
CHECKLIST AND SERVICE INFORMATION ..................................  31
TROUBLE-SHOOTING ....................................................................  31,32
LIMITED WARRANTY ......................................................................  35
                                                                                            
   
 
PAGE
                                                                                            
   
 
PAGE