Hitachi RAC-25WPA RAC25WPA ユーザーズマニュアル

製品コード
RAC25WPA
ページ / 706
 
10-9 
 
 
Installation of the indoor unit 
 
1.  How to remove the front cover 
Please refer to section for details. 
 
 
Screw (3 pieces) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2.  Drain pipe 
Make sure drain pipe slopes downward so that drain flows 
smoothly without being trapped in the middle. 
The drain hose (connecting port outer diameter: 16mm or 
20mm, length: 500mm) is included in the indoor unit. 
Prepare a drain pipe as shown in the following figure. 
To prevent condensation, the indoor drain pipe should be 
covered with heat insulation material with a thickness of 
more than 10mm. 
After piping is completed, check to make sure that drain 
discharges smoothly. Seal the drain pipe tightly with tape to 
keep dirt out. 
 
 
 
 
3.  Connecting the pipe to indoor unit 
Draw in the pipes through the hole of the wall or the floor to 
indoor. 
Arrange he pipe shown below. In the case that large pipe 
and small pipe arrange to make in front and behind. 
The indoor piping should be insulated with the enclosed 
insulation pipe. 
The pipe should first be cut longer than the length shown 
below. 
The excess section of the pipe should be cut off during pipe 
connection. 
 
- In the case of 
make a hole on 
the floor 
- In the case of make a hole on the wall 
 
 
(Unit: mm) 
 
- Sideways piping 
 
 
 
Remove PIPE SUPPORT. 
Insert the drain hose into the hole in the wall. 
Winding insulation pipe for drain hose and taping 4 or 5 
places to fix. 
Connect the pipe to the indoor unit. 
After completing the piping connection, cover the connector 
with the insulator. 
Connect the cord (follow instructions in the section 
“Connection of the connecting cord” on the reverse of this 
sheet). 
 
• 
Since there is some space between PIPE 
SUPPORT and the pipe, affix the insulator 
 to 
the PIPE SUPPORT. As shown in the figure below, 
affix the insulator 
 to the PIPE SUPPORT to 
sandwich it. 
 
 
Removal and installation 
of front cover 
Screw (3 pieces) 
Screw (2 pieces) 
If there is a baseboard 
If there is a baseboard 
5~15mm in thickness and 
115mm or less in height, 
cut the pipe bushing to 
conform to the 
baseboard. 
 
Baseboard 
15 
70 
115 
For sideways piping 
For right sideways piping, 
cut the stand’s bushing 
with a plastic cutter or 
similar tool and use a file 
for an attractive finish 
 
Bushing 
(2 pieces 
on each 
side) 
Cabinet 
For floor piping 
For floor piping, cut the 
front cover bushing with a 
plastic cutter or similar 
tool and use a file for an 
attractive finish. 
 
Cabinet 
Front 
cover 
bushing 
Front view 
Right side
 
i
 
Drain 
hose 
Make sure the 
drain hose slopes 
downward 
Drain pipe 
(procure 
locally) 
500 
88 
210 
96 
Unit: mm 
40
 
340 
Floor 
40  Above 350 
40 
180 
Before piping 
After piping 
16
0mm
 o
le
ss
 
W
al
W
al
Small
 pipe 
Large
 pipe 
170 
Top view 
Front view 
Right side view 
Floor 
Wall 
170
 
130
 
160mm
 o
les
180
 
40
 
W
al
Binder 
Flare 
insulator 
Binder 
Wrap the flare 
insulation, bind top 
and bottom flare 
insulation by binder. 
Wrap tape on flare 
insulation closely. 
Pipe 
support 
Insulator 
Pipe support