Operation With Cells
Disconnect all external electronics from the bq76925EVM prior to the connection of real cells. This
includes power supplies, electronic load, USB-TO-GPIO Adapter or MSP-FET430UIF that may be
connected.
7.2
Battery Connection Sequence
The connection of a real battery pack to the bq76925EVM requires a certain connection sequence for safe
operation.
The fundamental connection sequence is:
1. Ensure that all switches on S4 are open.
2. Connect BATT
.
3. Connect BATT+.
4. Connect CN6. The cell inputs have a specific assignment (1-1, 2-2, 3-3,etc) but no specific connection
timing sequence is required.
Remove the CN6 mating connector from the board before wiring cell connections to the terminals.
7.3
Six-Cell Operation
The procedure for six-cell operation with a cell pack is as follows:
1. Ensure that all switches on S4 are open.
2. Wire the seven-cell tap wires to the mating plug of CN6.
3. Connect BATT
.
4. Connect BATT+.
5. Connect CN6 to the EVM. The cell inputs can be connected in any order.
6. Connect to the evaluation software.
7. Change the Select Cell Count drop-down box on the home screen to 6.
7.4
Five-Cell Operation
The procedure for five-cell operation with a cell pack is as follows:
1. Ensure that all switches on S4 are open.
2. Wire the six-cell tap wires to positions 2 through 7 on the mating plug of CN6.
3. Apply a jumper wire from pin 1 to pin 2 on mating plug of CN6. (These are the inputs marked Cell 6
and Cell 5.)
4. Connect BATT
.
5. Connect BATT+.
6. Connect CN6 to the EVM. The cell inputs can be connected in any order.
7. Connect to the evaluation software.
8. Change the Select Cell Count drop-down box on the home screen to 5.
7.5
Four-Cell Operation
The procedure for four-cell operation with the simulation circuit is as follows:
1. Ensure that all switches on S4 are open.
2. Wire the five-cell tap wires to positions 3 through 7 on the mating plug of CN6.
3. Apply jumper wire from pin 1 to pin 2 on plug for CN6. These are inputs marked Cell 6 and Cell 5.
4. Apply jumper wire from pin 2 to pin 3 on plug for CN6. These are inputs marked Cell 5 and Cell 4.
5. Connect BATT
.
6. Connect BATT+.
7. Connect CN6 to the EVM. The cell inputs can be connected in any order.
8. Connect to the evaluation software.
9. Change the Select Cell Count drop-down box on the home screen to 4.
33
SLUU514
July 2011
bq76925EVM Evaluation Module